Wilderdog | Gear for Dogs on Adventures

Pacific Blue Reflective Long Lead - 30ft

Pacific Blue Reflective Long Lead - 30ft - Main image
$24 $48 In stock

Category: 攀繩狗牽繩

還在訓練喚回嗎?選用一條30英尺的長牽繩,讓您的狗狗有足夠空間自由探索,同時確保安全。這款長牽繩也非常適合露營時作為固定繩使用。(*但請勿讓狗狗在無人看管時使用固定繩!)

  • 長度:30 英尺
  • 採用緊密編織的聚丙烯/聚酯纖維⁵⁄₁₆ 英寸繩索製成
  • 編織反光絲線,適用於低光源或無光環境
  • 鋁合金鉤環,可旋轉並鎖定
    • 鉤環寬度:1.5 英寸
    • 鉤環長度:2.5 英寸
    • 額定承重:3 kN
  • 適用於所有犬種

Customer Reviews (4.8 / 5 · 21 reviews)

Christopher ★★★★★

My dog finally gets to explore the woods without me tripping over a short leash, and the 30-foot length is perfect for camping tie-outs too. The rope feels sturdy enough to handle her pulling, and the reflective bit gives me peace of mind on evening walks.

Sofia D. ★★★★★

Took this on our camping trip and used it as a tie-out while I set up the tent—the 30 feet gave him plenty of sniffing room without me worrying about him darting off. The reflective stitching caught my headlamp beam clearly at dusk, which was a nice safety bonus.

Ruby ★★★★★

The 30-foot length finally gives my dog real freedom to sniff around on hikes, and I love that it doubles as a tie-out for camping trips. The reflective stitching is a thoughtful touch for early morning or evening walks when visibility drops.