Wilderdog | Gear for Dogs on Adventures

Pacific Blue Reflective Long Lead - 30ft

Pacific Blue Reflective Long Lead - 30ft - Main image
$24.00 $48.00 In stock

Category: Climbing Rope Dog Leash

Still working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!) 

  • Length: 30 ft
  • Made with tightly spun, polypropylene/polyester ⁵⁄₁₆ in rope
  • Woven with reflective strands for use in low or no light conditions
  • Aluminum carabiner swivels and locks
    • Carabiner width: 1.5 in
    • Carabiner length: 2.5 in
    • Rated for 3 kN
  • Suitable for all dogs

Customer Reviews (5.0 / 5 · 3 reviews)

Elizabeth ★★★★★

The 30-foot length is perfect for letting my dog explore at the park while I still have control. I also love that it doubles as a sturdy tie-out when we're camping—the climbing rope material feels really durable.

Edward ★★★★★

The reflective stitching is a nice safety touch for evening walks, and the 30-foot length gives my dog just enough freedom without me losing control. It handled being tied out at the campsite last weekend without any fraying.

Thomas T. ★★★★★

Finally, a long lead that doesn't tangle like a bird’s nest—the reflective stitching is a lifesaver for evening walks. My pup gets to sniff and explore the full 30 feet at the park, and I still have peace of mind.